LIRR Long Beach

That Kind of Woman (1953), starring Sophia Loren, filmed key scenes at Long Beach station.

Here’s a detailed history of the Long Beach LIRR station:

🚈 Origins & Early Years (1880–1908)

  • 1880: Opened by the New York & Long Beach Railroad (NY&LB) as the southern terminus of their new line from Lynbrook, located directly on the Atlantic beachfront. This station featured a clock tower, water tower, and gazebo, and was designed to serve the grand Long Beach Hotel—then one of the world’s largest. [en.wikipedia.org], [en.wikipedia.org]

  • The station also connected to the Long Beach Marine Railway, which extended rail service to Lido Beach and Point Lookout until the mid-1890s. [en.wikipedia.org], [grokipedia.com], [en.wikipedia.org]

📦 Relocation & Rebuilding (1909)

  • Due to storm damage and coastal erosion, the LIRR petitioned to relocate the station about 1,000 feet north, away from the Atlantic shoreline. Approval was granted in February 1909. [en.wikipedia.org], [en.wikipedia.org]

  • June 1909: The present depot opened at Park Avenue & Park Place. Designed by Kenneth M. Murchison—noted architect behind Jamaica Station (1913) and Hoboken Terminal—it featured a more substantial structure, including a baggage house and express freight office. [en.wikipedia.org], [en.wikipedia.org], [hmdb.org]

⚡ Electrification & Expansion (1910–1960s)

🛠 Renovations & Modernization (1980s–Present)

  • 1986–1988: Major renovation and rebuilding efforts improved platforms, waiting areas, and accessibility—modernizing the 1909 depot while preserving its historic character. [en.wikipedia.org], [hmdb.org]

  • Early 2000s: Additions included a parking garage, bus depot (on Centre Street), a platform footbridge, and bicycle facilities. [en.wikipedia.org], [en.wikipedia.org]

  • 2025–2029: Under the MTA’s Capital Plan, a multi-phase Long Beach Station Improvement Project is underway. Phase 1 focuses on station aesthetics—pavers, planters, landscaping (eco-friendly, resilient to salt and drought), and enhanced safety. Phase 2 will target platform and substructure renovations projected in the 2030–2034 timeframe. [liherald.com]

📍 Context & Significance

  • Initially positioned beachfront to serve a resort community, the station’s relocation inland allowed for resilience against coastal flooding and storms.

  • Over time, it evolved into a key intermodal transit hub, linking LIRR service, Nassau County bus routes, and Long Beach’s local bus system. [en.wikipedia.org], [en.wikipedia.org], [grokipedia.com]

  • Today, station ridership averages around 9,400 weekday passengers, with annual ridership exceeding 3 million, peaking in summer due to beach tourism. [en.wikipedia.org], [qgazette.com]

📆 Timeline at a Glance

1880 Original beachfront station opens by NY&LB

1907 Long Beach Hotel burns down

1909 (Jun) Current Murchison-designed depot opens at Park Ave

1910 Electrification completed

1960s Street-level storefronts added

1986–1988 Major renovations and accessibility upgrades

Early 2000s Additions: parking garage, bus depot, footbridge

2025–2029 MTA’s improvement project phases 1 & 2 underway

This evolution reflects the station’s transition from a beachfront resort terminus to a robust, multifaceted transportation gateway—balancing historical preservation with modern needs.